---
title: Walmart South Euclid
description: The construction of the new Walmart Super Center was one of the first stores in the US to obtain LEED certification by the U.S. Green Building Council.
image: https://www.immelconstruction.com/hubfs/WM%20SE%20002.jpg
---

<https://www.immelconstruction.com/projects/walmart-south-euclid#close>

This is a search field with an auto-suggest feature attached.

- There are no suggestions because the search field is empty.

South Euclid, OH

# Walmart

General Contractor 

185,504 square foot new store

 Immel Construction holds a long-standing relationship with Walmart as a preferred general contractor, having constructed our first store with the brand in 1988 and providing construction services at over 100 locations throughout the Midwest.

[![WM SE 002](https://www.immelconstruction.com/hubfs/WM%20SE%20002.jpg) ](https://www.immelconstruction.com/hubfs/WM%20SE%20002.jpg)

[![WM SE 004_edit](https://www.immelconstruction.com/hubfs/WM%20SE%20004_edit.jpg) ](https://www.immelconstruction.com/hubfs/WM%20SE%20004_edit.jpg)

[![WM SE 007 Cases](https://www.immelconstruction.com/hubfs/WM%20SE%20007%20Cases.jpg) ](https://www.immelconstruction.com/hubfs/WM%20SE%20007%20Cases.jpg)

[![WM SE 006 Bakery](https://www.immelconstruction.com/hubfs/WM%20SE%20006%20Bakery.jpg) ](https://www.immelconstruction.com/hubfs/WM%20SE%20006%20Bakery.jpg)

[![WM SE 003_edit](https://www.immelconstruction.com/hubfs/WM%20SE%20003_edit.jpg) ](https://www.immelconstruction.com/hubfs/WM%20SE%20003_edit.jpg)

[![WM SE 001_edit](https://www.immelconstruction.com/hubfs/WM%20SE%20001_edit.jpg) ](https://www.immelconstruction.com/hubfs/WM%20SE%20001_edit.jpg)

## Description

This new super-center was one of the first Walmart stores in the US to obtain LEED certification by the United States Green Building Council. Sustainable features include the white membrane roof that was constructed to reduce the “heat island” effect. Daylighting is utilized throughout the building that will result in a 25% reduction of artificial lighting needed. Heat reclamation of waste heat from the refrigeration system is used, and additional doors were constructed to the meat and cheese cases which resulted in an energy reduction of 20%.

## Project Details

OWNER:  Walmart Stores, Inc.

AREA:  185,504 square foot new store

TIMELINE:  10-month construction period