---
title: Hilton Home2 Suites
description: Immel Construction served as the construction manager for the new Hilton Home2 in Green Bay, working with the Owner and Architect during pre-construction
image: https://www.immelconstruction.com/hubfs/310%20Home%202%20Green%20Bay%20Dec%2017.jpg
---

<https://www.immelconstruction.com/projects/hilton-home2-suites-green-bay#close>

This is a search field with an auto-suggest feature attached.

- There are no suggestions because the search field is empty.

Green Bay, WI

# Hilton Home2 Suites

 Construction Management | Concrete | Carpentry

96-room new hotel

Home2 Suites was completed with an aggressive construction schedule of just 9 months. Even with the challenges of a tight schedule, the project was completed 9 percent under the original budget.

[![310 Home 2 Green Bay Dec 17](https://www.immelconstruction.com/hubfs/310%20Home%202%20Green%20Bay%20Dec%2017.jpg) ](https://www.immelconstruction.com/hubfs/310%20Home%202%20Green%20Bay%20Dec%2017.jpg)

[![376 Home 2 Green Bay Cropped](https://www.immelconstruction.com/hubfs/376%20Home%202%20Green%20Bay%20Cropped.jpg) ](https://www.immelconstruction.com/hubfs/376%20Home%202%20Green%20Bay%20Cropped.jpg)

[![399 Home 2 Green Bay Dec 17](https://www.immelconstruction.com/hubfs/399%20Home%202%20Green%20Bay%20Dec%2017.jpg) ](https://www.immelconstruction.com/hubfs/399%20Home%202%20Green%20Bay%20Dec%2017.jpg)

[![342 Home 2 Green Bay Dec 17-1](https://www.immelconstruction.com/hubfs/342%20Home%202%20Green%20Bay%20Dec%2017-1.jpg) ](https://www.immelconstruction.com/hubfs/342%20Home%202%20Green%20Bay%20Dec%2017-1.jpg)

[![230 Home 2 Green Bay Dec 17](https://www.immelconstruction.com/hubfs/230%20Home%202%20Green%20Bay%20Dec%2017.jpg) ](https://www.immelconstruction.com/hubfs/230%20Home%202%20Green%20Bay%20Dec%2017.jpg)

[![146 Home 2 Green Bay Dec 17](https://www.immelconstruction.com/hubfs/146%20Home%202%20Green%20Bay%20Dec%2017.jpg) ](https://www.immelconstruction.com/hubfs/146%20Home%202%20Green%20Bay%20Dec%2017.jpg)

[![263 Home 2 Green Bay Dec 17](https://www.immelconstruction.com/hubfs/263%20Home%202%20Green%20Bay%20Dec%2017.jpg) ](https://www.immelconstruction.com/hubfs/263%20Home%202%20Green%20Bay%20Dec%2017.jpg)

[![290 Home 2 Green Bay Dec 17](https://www.immelconstruction.com/hubfs/290%20Home%202%20Green%20Bay%20Dec%2017.jpg) ](https://www.immelconstruction.com/hubfs/290%20Home%202%20Green%20Bay%20Dec%2017.jpg)

[![1106_Hampton_GRB_2023](https://www.immelconstruction.com/hubfs/1106_Hampton_GRB_2023.jpg) ](https://www.immelconstruction.com/hubfs/1106_Hampton_GRB_2023.jpg)

## Description

Home2 Suites is a new four-story extended stay hotel with guest rooms, an indoor swimming pool, fitness center, and meeting rooms. 

Each suite in the hotel will feature full kitchens, modular furniture, internet service and guests can now utilize communal spaces, a combined laundry room, a small market, complimentary breakfast, fire pit, grill area, indoor saline pool and fitness center.

Immel served as the construction manager for the project, and worked with the Owner and Architect during pre-construction to provide services including preliminary cost estimates, constructability review, and preliminary construction scheduling.

## Project Details

OWNER:  Beechwood Development, LLC

ARCHITECT:  Icon Architectural Group

AREA:  96-room new hotel

TIMELINE:  9-month construction period

SAVINGS:  $576,000 saved